English 中文网 漫画网 爱新闻iNews 翻译论坛
中国网站品牌栏目(频道)
当前位置: Language Tips> 天天读报> 每日播报

BP affixes new cap on leaking Gulf well

[ 2010-07-14 16:05]     字号 [] [] []  
免费订阅30天China Daily双语新闻手机报:移动用户编辑短信CD至106580009009

进入英语学习论坛下载音频 去听写专区一展身手

BP robots attached a new, tighter-fitting cap on top of the gushing Gulf of Mexico oil leak, raising hopes that the crude could be kept from polluting the water for the first time in nearly three months.

Placing the cap on top of the leak was the climax of two days of delicate preparation work and a day of slowly lowering it into position a mile (1.6 km) below the sea. The capping project - akin to building an underwater Lego tower - is just a temporary fix but the oil giant's best hope for containing the spill.

The next unknown is whether the 18-foot-high (5.5-meter), 150,000-pound (68,000-kg) metal stack of pipes and valves will work.

BP plans to start tests on Tuesday, gradually shutting the valves to see if the oil stops or if it starts leaking from another part of the well.

Residents have been skeptical BP can deliver on its promise to control the spill, but the news was still welcome on the coast. Dwayne Touchet, a 44-year-old shrimper from Welsh, Louisiana, said he was relieved to hear the cap was on and can only pray that it works.

Touchet is working in the Vessels of Opportunity program, where BP employs local boat owners and fisherman out of work because of the spill.

"It's not over, there's still a lot of oil to clean up," he said. "We don't know how it will affect it (the water) in the years to come, all we can do is trust in the Lord."

On Monday, live video streams trained on the wellhead showed the cap being slowly lowered into place, 11 hours after BP Chief Operating Officer Doug Suttles said the company was close to putting the seal in place. BP officials said the device was attached that evening.

The cap will be tested and monitored to see if it can withstand pressure from oil and gas starting on Tuesday morning for six to 48 hours, according to National Incident Commander Thad Allen. On his Facebook page, Allen also shared news of the development. "Getting there," Allen wrote in a status update shortly after the cap landed on the well.

The cap will be tested by closing off three separate valves that fit together snugly like pairs of fists, choking off the oil and blocking it from entering the Gulf.

BP doesn't want the flow of oil to stop instantaneously, said Don Van Nieuwenhuise, director of Professional Geosciences Programs at the University of Houston. Shutting the oil off too quickly could cause another explosion, he said.

"Rather than like a train running into a brick wall, it'll be more like putting the brakes on slowly," he said. "That's what they're aiming for. You can keep the brakes on and everyone arrives alive, or you hit the wall and have big problems."

去听写专区一展身手

(中国日报网英语点津 Helen 编辑)

BP affixes new cap on leaking Gulf well

BP affixes new cap on leaking Gulf well

Todd Balazovic is a reporter for the Metro Section of China Daily. Born in Mineapolis Minnesota in the US, he graduated from Central Michigan University and has worked for the China daily for one year.

 
中国日报网英语点津版权说明:凡注明来源为“中国日报网英语点津:XXX(署名)”的原创作品,除与中国日报网签署英语点津内容授权协议的网站外,其他任何网站或单位未经允许不得非法盗链、转载和使用,违者必究。如需使用,请与010-84883631联系;凡本网注明“来源:XXX(非英语点津)”的作品,均转载自其它媒体,目的在于传播更多信息,其他媒体如需转载,请与稿件来源方联系,如产生任何问题与本网无关;本网所发布的歌曲、电影片段,版权归原作者所有,仅供学习与研究,如果侵权,请提供版权证明,以便尽快删除。
 

关注和订阅

人气排行

翻译服务

中国日报网翻译工作室

我们提供:媒体、文化、财经法律等专业领域的中英互译服务
电话:010-84883468
邮件:translate@chinadaily.com.cn